Discharge Off Lease

Level 1

Level 2

Level 3

Requirements Include

  • Effluent testing , 14 days +/- 4 days
  • 80% of the time test results must meet 40/40
  • as per variance holder’s criteria

Level 4

Decomission Site:

  • vacuum truck pumps out system
  • disconnect pumps and equipment and remove from site
  • sumps should be pumped out and the pit filled in.